Blog #2 Spring 23
Over the work period of February 4 - February 18, the team continued to make small tweaks to the design in order to more easily manufacture various components. All materials necessary to begin machining the device have been acquired, and have been handed off to the machinist at Iron Ring Technologies. The team is currently waiting for the components to be machined. Iron Ring has guaranteed these items to be machined by the end of February at the latest. Team 7 has also updated CAD designs and drawings for various parts of the Camera Cooling System (CCS). This includes the external aluminum rod casing (Figure 1), the removable case lid (Figure 2), and the polycarbonate sheet lens (Figure 3). For the removable case lid (Figure 2), a lip was added to allow the lid to be more securely attached to the body of the case. A challenge for Team 7 during this work period was altering the existing design so that the components can be machined. To get around this issue, Team 7 worked directly ...